Rabat Agdal Train Station

Project Type

Infrastructure and Civil Engineering

Project Owner

The National Railway Office (ONCF)

Overall Investment

405 329 470,77 MAD

Location: Rabat
Dimension(s) : 23,000 m² (passenger buildings) | 58,000 m² (exterior facilities)
Key figures: Esplanade 12,000 m² | Parking for 800 spaces (34,000 m²) | VIP lounges

The project for the new Rabat Agdal Station supports the urban development of the country’s capital, featuring passenger facilities covering an area of 23,000 m².

Outdoor amenities covering 58,000 m² include green spaces, pedestrian paths, fountains and playgrounds. Designed and built in compliance with new environmental regulations, this new turnkey station project also includes:

– Office and retail spaces;

– A level dedicated to cafes and restaurants;

– A 12,000-square-meter pedestrian esplanade spanning the railroad tracks, with six 400-square-meter platforms and ten tracks;

– An 800-space parking lot covering an area of 34,000 square meters;

– VIP lounges.

 

Une mission tous corps d’état maîtrisée

TGCC a assuré une mission complète, allant du gros œuvre à la coordination des corps d’état secondaires, en intégrant également les exigences techniques spécifiques du client. Le chantier a mobilisé une équipe pluridisciplinaire et des moyens logistiques conséquents pour garantir une progression fluide et une qualité d’exécution irréprochable à chaque étape.

Une gestion rigoureuse des délais et des normes

Dans un contexte où chaque jour compte, TGCC a mis en œuvre un pilotage précis du planning, soutenu par des outils de gestion avancés et une coordination continue avec les intervenants. Le respect des normes de sécurité, des standards environnementaux, ainsi que des exigences architecturales imposées par IKEA ont été au cœur de chaque décision.

 

other projects

Plage des Nations
Tower 33
Les Arènes