Healthcare
National Agency for Public Infrastructure (ANEP)
674 353 832,86 MAD
A new “Ibn Sina” hospital is under construction. It will be a modern facility with a covered area of approximately 190,000 m². Government Advisory +1
Planned capacity: 1,044 beds, including 148 beds for intensive care. Government Council
The project includes: inpatient units, intensive care units, an emergency department, post-acute care and rehabilitation units, technical facilities, a dialysis center, specialized units (severe burns, serious respiratory diseases, etc.), a helipad, a parking lot with ~1,300 spaces, green spaces, and eco-construction and energy-efficiency solutions (natural ventilation, rainwater harvesting, photovoltaic panels, etc.). Government Advisory +1
The architectural design of the new hospital has been entrusted to the firms AIA Life Designers and AWMountassir. The architecture and landscaping are designed to combine modernity, comfort, hospital efficiency and environmental sustainability.
TGCC a assuré une mission complète, allant du gros œuvre à la coordination des corps d’état secondaires, en intégrant également les exigences techniques spécifiques du client. Le chantier a mobilisé une équipe pluridisciplinaire et des moyens logistiques conséquents pour garantir une progression fluide et une qualité d’exécution irréprochable à chaque étape.
Dans un contexte où chaque jour compte, TGCC a mis en œuvre un pilotage précis du planning, soutenu par des outils de gestion avancés et une coordination continue avec les intervenants. Le respect des normes de sécurité, des standards environnementaux, ainsi que des exigences architecturales imposées par IKEA ont été au cœur de chaque décision.