RABAT HIGH SCHOOL OF EXCELLENCE

Project Type

Education

Project Owner

UM6P / OCP

Overall Investment

2 140 814 305,85 MAD

Location: Rabat
Dimension(s) : 16 ha | 71,000 m² of built area
Key figures: FINA-approved Olympic swimming pool | Athletics track | Multi-sports fields

A landmark project dedicated to education and sports The Lycée d'Excellence de Rabat (LYDEX - Rabat High School of Excellence) stands out for the scale and complexity of its facilities, reflecting a national ambition to promote high-quality education and world-class infrastructure. Designed by Spanish architect Ricardo Bofill. The campus includes modern academic buildings, student housing, a dining hall, and state-of-the-art sports facilities. Among these facilities are a FINA-certified Olympic-size swimming pool, a track and field track, multi-purpose sports fields, and areas dedicated to martial arts. The soccer field, featuring a tartan surface, and the Olympic-size swimming pool were constructed by the same contractor used for the Paris 2024 Olympic Games, under the supervision of INSEP (National Institute of Sport, Expertise, and Performance), ensuring the highest standards. The design and execution of the project required extreme flexibility to accommodate frequent changes to plans and materials, all while meeting tight deadlines. TGCC and its subsidiaries contributed to the success of this project by rigorously meeting the expected requirements in terms of logistics, materials, and resource management—and, ultimately, the quality of execution.

16 hectares of total area

71,000 m² of built-up area.

 

Une mission tous corps d’état maîtrisée

TGCC a assuré une mission complète, allant du gros œuvre à la coordination des corps d’état secondaires, en intégrant également les exigences techniques spécifiques du client. Le chantier a mobilisé une équipe pluridisciplinaire et des moyens logistiques conséquents pour garantir une progression fluide et une qualité d’exécution irréprochable à chaque étape.

Une gestion rigoureuse des délais et des normes

Dans un contexte où chaque jour compte, TGCC a mis en œuvre un pilotage précis du planning, soutenu par des outils de gestion avancés et une coordination continue avec les intervenants. Le respect des normes de sécurité, des standards environnementaux, ainsi que des exigences architecturales imposées par IKEA ont été au cœur de chaque décision.

 

other projects

Plage des Nations
Tower 33
Les Arènes