Nouaceur – Expansion of Terminal 1 at Mohammed V Airport

Project Type

Infrastructure and Civil Engineering

Project Owner

Ministry of Public Works and Transportation – National Airports Authority (ONDA)

Overall Investment

410 023 948,32 MAD

Location: Nouaceur
Dimension(s) : 12,000 m² renovated + 42,000 m² extension
Key figures: Three-level extension | Passenger capacity doubled

The expansion project for Terminal 1 at Mohammed V Airport includes the complete renovation of the old terminal building, covering 12,000 m² dedicated primarily to the public concourse, as well as the construction of a new 42,000 m² expansion area spread over three levels. With this structural and functional modernization, the airport will double its passenger capacity and reinforce its strategic role in domestic and international air traffic.

• 12,000 m² renovated (old terminal building – public concourse)

• 42,000 m² extension across three levels

• Passenger capacity doubled

 

Une mission tous corps d’état maîtrisée

TGCC a assuré une mission complète, allant du gros œuvre à la coordination des corps d’état secondaires, en intégrant également les exigences techniques spécifiques du client. Le chantier a mobilisé une équipe pluridisciplinaire et des moyens logistiques conséquents pour garantir une progression fluide et une qualité d’exécution irréprochable à chaque étape.

Une gestion rigoureuse des délais et des normes

Dans un contexte où chaque jour compte, TGCC a mis en œuvre un pilotage précis du planning, soutenu par des outils de gestion avancés et une coordination continue avec les intervenants. Le respect des normes de sécurité, des standards environnementaux, ainsi que des exigences architecturales imposées par IKEA ont été au cœur de chaque décision.

 