EUROMED Fez

Project Type

Education

Project Owner

UEMF

Overall Investment

275 469 404,92 MAD

Location: Fez
Dimension(s) : 54 hectares in area | 5,000 m² sports complex
Key figures: FIFA certified pitch (3,600 seats) | 3,400 m² restaurant | Conferences for up to 1,600 people.

A large-scale university project bringing together several schools on a 5.4-hectare site. This project, divided into two phases, demonstrates TGCC’s expertise in the construction of complex infrastructure across all building trades. The first phase involved the construction of four buildings housing classrooms, laboratories, and practical training rooms. The second phase, recently completed, included the construction of major annexes, such as a 5,000 m² sports complex featuring an Olympic-sized swimming pool certified to FINA standards, a FIFA-certified soccer field with 3,600 seats—intended in particular for training sessions for the 2030 World Cup—as well as a 3,400-square-meter restaurant spread over three floors.

This phase also includes a seven-story administrative building (ground floor plus seven stories), as well as six annex buildings housing a large library and two conference centers capable of accommodating up to 1,600 people. The complex is complemented by an entrance hall and a central forum. The campus’s distinctive architecture, characterized by sloping, openwork panels, gives the complex a unique character that reflects the cultural influence of Fez, Morocco’s cultural capital. The TG Prefa subsidiary also contributed to this project by supplying the concrete, ensuring solid and durable structures. This project positions Euromed University as a center of academic and athletic excellence, meeting international standards.

54 hectares in area

5,000 m² sports complex

3,600-seat soccer field

 

Une mission tous corps d’état maîtrisée

TGCC a assuré une mission complète, allant du gros œuvre à la coordination des corps d’état secondaires, en intégrant également les exigences techniques spécifiques du client. Le chantier a mobilisé une équipe pluridisciplinaire et des moyens logistiques conséquents pour garantir une progression fluide et une qualité d’exécution irréprochable à chaque étape.

Une gestion rigoureuse des délais et des normes

Dans un contexte où chaque jour compte, TGCC a mis en œuvre un pilotage précis du planning, soutenu par des outils de gestion avancés et une coordination continue avec les intervenants. Le respect des normes de sécurité, des standards environnementaux, ainsi que des exigences architecturales imposées par IKEA ont été au cœur de chaque décision.

 

other projects

Plage des Nations
Tower 33
Les Arènes